Today @ Colorado State has been replaced by SOURCE. This site exists as an archive of Today @ Colorado State stories between January 1, 2009 and September 8, 2014.

Facilities / Parking

Lory Student Center to begin work over Winter Break

November 29, 2012

In the coming weeks, the Lory Student Center begins its much anticipated revitalization to better serve its students.

Immediately after fall commencement, contractors will begin utility work near RAMtech and fencing will be put up along the west side of the LSC. Though fencing will be up in January 2013, it will cause little disruption to student activity.

Services still available

Following commencement in May, fencing will fully surround student center central (the center of the building, which excludes its north end and the Theatre), eliminating access to much of the building. Services that will still be available at the LSC include:

  • CSU Bookstore
  • Aspen Grille
  • Adult Learner and Veterans Services
  • Student Legal Services
  • Cam’s Lobby Shop
  • Bagel Place 2
  • the Information desk
  • Transfort
  • north end meeting rooms
  • LSC Theatre

The revitalization is expected to be completed in fall 2014. For maps or up-to-date information about the Renovation, visit the Lory Student Center.