Today @ Colorado State has been replaced by SOURCE. This site exists as an archive of Today @ Colorado State stories between January 1, 2009 and September 8, 2014.

Facilities / Parking

Engineering lot north of Lory Student Center closes for summer

May 13, 2011

The Engineering lot, #310, which is directly north of the Lory Student Center, will be closed May 18 to Aug. 1.

The existing pavement will be torn out and replaced with a new concrete surface.

The lot includes paid spaces and is adjacent to the Transfort bus stop. The bus lane on the west side of the lot will remain open. Some one-hour paid parking spaces also will be available on the west side of the lot during construction when the project allows.

Lot #305, which is north of lot #310, will remain open during construction. Access from the TILT lot, #315, which is east of lot #310, also will remain open during construction.

Parking services will add short-term metered spaces in the Hartshorn East lot, #420, for the summer months while the Engineering lot is closed for construction.

Lot #165, which is on the south side of Green Hall, will be changed to “A” parking for the summer to help offset the temporary loss of the Engineering lot.

Lot #155 will permanently close Monday, May 16, for construction of the Engineering II building.

For more information on parking on campus, visit http://parking.colostate.edu/.


Contact: Dell Rae Moellenberg
E-mail: dellrae.moellenberg@colostate.edu
Phone: 970-491-6009