Today @ Colorado State has been replaced by SOURCE. This site exists as an archive of Today @ Colorado State stories between January 1, 2009 and September 8, 2014.

Facilities / Parking

Meridian Avenue closure due to construction projects

May 12, 2011

Another round of major construction projects is changing the face of CSU and will also change vehicular access through campus for a while.

Meridian Avenue will close to thru traffic from South Drive to Laurel Street on May 16, 2011 and will not open again until end of construction sometime in summer/fall of 2013.

More details

Meridian Avenue will become the primary route for construction traffic supporting the Parmelee 4th floor, Engineering II, Library addition and LSC Theater renovation projects.

We anticipate a large volume of construction traffic, so in the interest of safety, Meridian Avenue will only be open to construction traffic, Transfort, and emergency and service vehicles. Pedestrian and bike traffic will be accommodated in separate marked lanes outside of the construction haul routes.

Please see the attached map for more information and contact Fred Haberecht at 491-0162 for questions or more information.

Thanks for your patience and understanding as these construction projects commence.

Downloadable map in PDF format


Contact: Shelly Carroll
E-mail: Shelly.Carroll@colostate.edu
Phone: 491-0167