Today @ Colorado State has been replaced by SOURCE. This site exists as an archive of Today @ Colorado State stories between January 1, 2009 and September 8, 2014.

Facilities / Parking

Steam line replacement south of Weber Building

August 17, 2012

No pedestrian access

A steam line replacement will begin on Aug. 20 south of Weber Building and continue through Sept. 28. There will be no pedestrian access between Weber and Engineering during this time.

Emergency exits from Weber Building will be maintained, as well as access to the Engineering loading dock.

Please call Roger Elbrader at (970) 491-0142 with questions.


Contact: Shelly Carroll
E-mail: shelly.carroll@colostate.edu
Phone: (970) 491-0167